To either locate an existing Social Value Account Plan or assign one to a project you will first need to head to the dashboard in Mi Social as seen below:
Once you have returned to this page you will be greeted with a list of projects, some of these may already have an SVA plan added, in this instance you can either download the SVA plan for viewing or go through to the Social Value Plan dashboard, as seen below:
If you opt to download the SVA plan this will be downloaded to the device you are using in PDF form.
Furthermore, if you advance to the Dashboard you will be greeted with something similar to the page below:
On this page you can perform a number of activities:
-
Spectate measures in place to ensure targets are reached (and what those targets are)
-
Download the progress report (downloads a PDF to your device)
-
Change the SVA plan (allows the editing of the plan, including adding and removing specific measures or downloading a template SVA plan to use instead)


